Working on any construction site usually involves using many small machines and tools to get the job done. While some of these are manually operated, others may need electricity to work. This can present a problem if you’re building miles from the nearest power source.
Fortunately, you can opt for generator hire Melbourne construction companies are relying on to keep tools and machines running. While using a generator may seem reasonably straightforward, it’s important to note certain important guidelines.
Keep Everyone Safe with These Simple Tips
Generators, like other machines and tools on the job site, can be a major risk if they aren’t used correctly. That means, if you’re using a generator for the first time, you should keep reading to learn about the safety tips to keep in mind.
1. Read the Instructions
Instruction reading may sound obvious, but it’s the number one safety tip that people often neglect. After all, for employees working with machinery all day, how difficult can operating a generator be?
The reality is that each generator model is different. To ensure everyone’s safety, always familiarize yourself with the dos and don’ts of the model you’ve hired. Speak to the plant hire consultant for a quick rundown for easy and safe operation, or request the manual.
2. Always Place the Generator Outdoors
If you’re using the generator on a job site, it will most likely be standing outside. But, on the off chance that you had any plans of putting the generator in your makeshift site office, our experts warn against doing that!
Most generators work with petrol or diesel which means they produce deadly carbon monoxide fumes. Always ensure that the generator remains outside in the fresh air when in operation. If you’re worried about the elements affecting the unit, consider building a temporary car port where the generator can stay dry without containing the fumes.
3. Never Overload the Generator
Don’t opt to hire the cheapest generator and then assume that you can power up many different tools with it. Keep in mind that there is a limit to the number of items the generator will be able to safely support.
Follow these simple steps to determine what size generator you’ll need:
- Establish what exactly you need to use the generator for
- Check the labels on tools and machinery to calculate the power requirements
- Total the power requirements and request a generator that can match the requirements
- Confirm your calculations with an expert from the plant hire company.
- Never overload the generator as this may blow a fuse and damage the equipment you have connected
4. Plug Items in Correctly
Ensure that all tools or machinery that you’re connecting are plugged in properly. You can either plug appliances in directly or use a heavy-duty extension cord. In this instance, you should ensure that the extension cord is suitable for outdoor use as well as suitable for the tools you want to connect.
5. Confirm the Fuel Type
In most instances, you’ll get your generator with a full tank of fuel. With a full day of extensive work, this may not last the entire day, so you’ll probably need to refuel.
When refuelling:
- Only use the exact type of fuel specified by the hiring company or the instructions listed on the label
- The generator should be turned off and left to cool down before refuelling—any fuel accidentally spilt on hot engine components could ignite
- Be sure to clean any spillages immediately as this poses a fire risk
- Seal the container of the fuel container to avoid vapours escaping
6. Ensure Correct Training is Done
It’s necessary to ensure that all employees on the job site know how to use the generator, whether it’s meant for their work or not. For one thing, they should know how to switch the generator off in case of an emergency or issue. It will only take a few minutes to onboard everyone, so don’t neglect this task.
Important tip: ensure that you have the necessary equipment to put a fire out, should it become necessary. Everyone must know where this is located.
7. Correct Storage
Whether you’re making use of the scissor lift hire Melbourne contractors opt for, or simply hiring a generator, storage is important. Speak to the plant hire contractors about the best procedures to follow to store the generator.
Always ensure that the unit has cooled down before storing it. All tools and machines should be plugged out of it before packing the generator away for the day.
Final Thoughts
Generators are excellent for ensuring that the job gets done even when there isn’t a power source in sight. Implementing a few safety procedures will ensure that your employees are safe while using this type of equipment. It will prevent damage to machinery and potential fire hazards. Always remember, safety first!